The scope of work covers the supply of isolation transformers and electrical boards fitted with LIMs (Line Isolation Monitors) to monitor continuously the safety of the circuits feeding the operating theaters electrical equipment and insure the continued operation in the event of single faults.
The Consultant: AUBMC
The Contractor: AUBMC